Job Type:
Office and Educational Furniture Refurbishment
Sector:
Education
Location:
Newport Wales
Services Used:
- Project management
- Source, supply and delivery of educational furniture
- Space planning and design
- Standard furniture
- Risk Assessments & Method Statements
- Delivery schedule
Project Info:
Client:
Pillgwenlly Primary School – Newport, Wales
Project:
Office & Educational Furniture Refurbishment
Project Value:
Circa £48k
Project Date:
November 2024
Modern and functional educational furniture to support students at new Welsh Medium Primary School
We were delighted to be invited to collaborate alongside the facilities management team at Newport Norse, the approved partners to Newport City Council, to source, procure, deliver, and install educational furniture for the new Welsh Medium Primary School, including the relocation of Pillgwenlly Primary School.
The new purpose-built School on the Whiteheads development is designed to accommodate up to 630 pupils, substantially rising from its previous limit of 546, ensuring it meets the growing demand for mainstream education.
Our goal was to design and create a modern and functional learning environment that encourages active participation, open communication, and a keen sense of community. To help visualise new classrooms, offices, staffroom, and breakout areas, we produced 2D and 3D space designs that brought our ideas to life.
We also provided a detailed presentation highlighting products and material finishes for discussion. As ESPO approved suppliers, we used the 282_22 furniture framework to meet the schools’ specific needs, carefully selecting furniture tailored to support the demands of students and staff.
One of the focuses for the school was the introduction of a nurturing space that would provide a safe place to provide emotional and wellbeing support, or for focussed learning to aid development. We wanted this environment to have a calm aesthetic so we equipped it with soft floor furnishings including a floor seating couch, comfortable support pillows, an ottoman storage couch, and a matching rug.
As part of our project-managed service, all of the furniture and equipment was delivered on our vehicles and installed by our trained installation technicians following a detailed delivery schedule.
Summary
We are delighted with the completed FF&E project at Pillgwenlly Primary School. The newly installed, stylish, and adaptable educational furniture not only prioritises comfort but also creates an environment that supports and enhances student learning.
Working alongside Steve from COI for the FF&E elements of the Whiteheads project was amazing, from client meetings to creating visuals nothing was too much of an ask, the room layouts Steve designed were fantastic elements for the school to see visuals of each room and how their furniture would look. The installation of the products was quick and efficient. No issues occurred, and it was smooth sailing. The client and contractor were so pleased with all the elements COI installed, the show stopper was the staff room everyone was in ore of it, and the recycled materials used to make the chair was that extra touch to make the school even more sustainable.
Emily McLoughlin
Trainee Project Manager, Newport NorseCOI conducted themselves very well, from the up-front logistic meeting’s to the delivery of the project! I enjoyed working with them and would hope to work with them again in the future. The staffroom also looks amazing!
Rhys Lewis
Project Manager, BAM ConstructionOffice Furniture Refurbishment – Gallery
Last Updated on January 14, 2025